Highlights
- •
A pseudo-local reserve market is established considering EV’s reserve potential.
- •
Optimal bidding strategy for DSO in China’s electricity markets is constructed.
- •
A framework for EV coordinated V2G operation is developed.
- •
The proposed method can limit load deviation cost for more profits.